Update:
Both squash courts are now operable with only floor coverings to the viewing area to be completed. Lounge/Bar/Pro’s Shop facilities are due to re-open on Wednesday 7th March 2007.
CRGP Limited has been appointed to oversee the flood damage reinstatement of Strathgryffe Tennis and Squash Club, in Houston, Renfrewshire.
The flood occurred on 14th December 2006, and CRGP attended on 15th December and that afternoon the strip out works commenced.
Despite the flood the Club remains open with facilities largely unaffected.
The squash courts and bar/lounge areas were stripped and dried over the Christmas period, with squash courts, bar, lounge, kitchen, Pro’s Shop areas being reinstated over the past 8 weeks.
The circulation areas have been reinstated with only floor coverings still to be renewed.
The next phase of the works comprises the changing and toilet facilities which will be stripped out, dried and renewed. Temporary facilities will be introduced during this period to minimise disruption to the Club.
Main contractor is Firwood Construction Services Limited.